In February 2021, Winter Storm Uri froze Texas, knocked out power across the state, and left water and wastewater systems running without electricity. Pumps stopped, treatment steps halted, and utilities learned how little margin they had when the grid failed. The Legislature answered with Senate Bill 3, which took effect in June 2021 and put emergency preparedness requirements on Texas water and wastewater utilities.
For plant operators, the design rules that matter most for backup power sit in TCEQ’s 30 Texas Administrative Code §217.36, which governs emergency power at wastewater treatment facilities. This guide explains how SB 3 and that rule fit together, what a compliant backup power setup includes, and how to specify a generator that meets it.
Winter Storm Uri Turned Backup Power Into A Compliance Requirement
Before 2021, many utilities treated generators as a good idea. SB 3 changed that by requiring affected utilities to adopt emergency preparedness plans showing how they will keep operating through an extended outage, and by giving TCEQ authority to review those plans. Utilities had options for meeting the requirement, including backup generators, alternate power sources, connections between pressure zones, added storage, and demand management.
What SB 3 Requires Of Water And Wastewater Utilities
Affected utilities had to submit their plans to TCEQ by March 1, 2022, and TCEQ reviews them and can send comments back for response. On the water side, plans must keep pressure at or above 20 psi through an outage lasting beyond 24 hours. TCEQ’s rules also require generators that appear in an approved plan to be inspected, operated, and maintained, which turns the generator from a one-time purchase into an ongoing program.
How TCEQ Rule 217.36 Governs Wastewater Plant Design
Chapter 217 sets design criteria for domestic wastewater treatment facilities, and §217.36 is the section that covers emergency power. It opens with a plain objective: the plant must be designed to prevent the discharge of untreated or partially treated wastewater during electrical power outages. Everything else in the section, from outage records to fuel storage, supports that goal.
Wastewater Plants Must Keep Treating Through Any Outage
The rule starts with evidence. The owner must review at least 60 consecutive months of outage records from the electric utility, and those records must be on the utility’s letterhead, signed by a knowledgeable employee, and list the number, date, and duration of each outage. That reliability determination goes into the engineering report and drives how much protection the plant needs.
Protection must last at least as long as the longest outage in that record or 20 minutes, whichever is longer, with the design accounting for peak flow, inflow, and infiltration. If the longest outage exceeds 48 hours and generators provide the backup, the owner needs a fuel supply contract that guarantees delivery in an emergency, plus enough onsite fuel storage for the length of the emergency. The plant must also hold up in outages longer than the records predict.
The engineering report has to describe how the plant operates in an emergency and identify the units that must run continuously. At minimum, the plant must provide primary treatment and disinfection that meets its permit’s bacteria limits during every outage, run disinfection at full capacity, and keep return activated sludge pumps operating. Main and alternate power cannot come from the same power plant, and collection system storage cannot serve as the only protection.
Portable Generators Qualify Only When The Paperwork And Hardware Are In Place
Rule 217.36 allows portable generators and pumps, but it attaches conditions that a rental or a unit in a yard does not meet by default. The plant needs a tested quick-connect mechanism, a properly sized automatic transfer switch where the generator will connect, and a licensed, knowledgeable operator available on call around the clock. The engineering report must also describe how the temporary system is deployed during every type of weather event that could cause an outage.
For each portable generator or pump, the report must document:
- Where the unit is stored
- How long it takes to transport it to the point of use
- Which treatment units it backs up
- A routine maintenance and upkeep plan
Utilities that choose this route can compare trailer-mounted generators, which arrive ready to tow and connect. Transport time is a compliance number as well as a logistics number, so placing the unit near the site it protects makes the engineering report easier to defend.
Size And Specify The Generator For Pump Motors And Storm Flow
Water and wastewater loads are dominated by pump motors, which draw a surge of current when they start. A generator sized only for running load can stall or sag at that moment, so size for the startup load and confirm the transfer switch is rated for motor inrush. Our water districts generator page covers these points, including units that start unattended and lift stations sized for peak storm inflow.
Match The Unit To The Facility
Small lift stations often fit units in our 25 kW to 99 kW range, while treatment plants with aeration, disinfection, and sludge pumping move into the 100 kW to 499 kW and 500 kW to 999 kW ranges. The shop by kW page lists every range, and the right choice depends on a load calculation from your engineer.
Plan Fuel Around The Longest Outage
The 48-hour fuel provision pushes many plants toward diesel, since a tank on site satisfies the storage requirement directly. Plants with pipeline service can consider natural gas, though the fuel-contract and storage language in the rule still needs a clear answer from your engineer. Our guide to diesel and natural gas generators compares the two for backup duty.
Deadlines Have Passed, So Maintenance Records Carry The Compliance Burden
The 2022 submission deadline is behind most utilities, so the open question is whether the generator will start and carry load when an outage hits. Regular exercising, load bank testing, and written maintenance logs answer that question for an inspector. Our posts on load bank testing and NFPA 110 guidelines explain the testing side, and our service and maintenance team can set up a schedule for units you already own.
Close The Gap Between Your Plan And The Equipment On Site
If your emergency plan calls for backup power that your site does not yet have, or your current unit would struggle with the pumps it must restart, now is the time to compare options. Browse our generator inventory for new and used units, review what our promise covers, or send your load and fuel details through the contact page and we will point you to units that fit.